Painted walkway demarcation at the Aiteo Field Logistic Base (FLB), marking out pedestrian routes around the site.
Every project runs the same route, whether it is a single equipment order or a full fabrication and installation scope. The size of the job changes the paperwork, not the standard.
Start a projectPractical solutions, reliable delivery, lasting value — a look at how we approach real engineering challenges.
Rehabilitation & Upgrade Works
Rehabilitation of the helipad at Nembe Creek, returned to service with renewed deck markings.
Read the case study →
Equipment Supply & Site Safety
A personnel access control board at Nembe Creek-2 Flowstation, used to account for everyone moving in and out of the facility.
Read the case study →